MATATAG curriculum
Grade 12 Broadband Installation
19 learning competencies across 4 quarters, as the Department of Education curriculum guide prints them.
Quarter 1
Content standard
The learners demonstrate an understanding of the principles, tools, safety procedures, and technical requirements necessary for the proper installation of mast, guy, and accessories in accordance with industry standards.
Performance standard
The learners perform mast and cable installation in accordance with technical specifications and industry standards.
Learning competencies (6)
BBINST-G12-Q1-01
Discuss the fundamentals of broadband installation
BBINST-G12-Q1-02
Discuss Fixed Wireless Systems
BBINST-G12-Q1-03
Discuss preparations for mast installation
BBINST-G12-Q1-04
Perform installations of mast and accessories
BBINST-G12-Q1-05
Discuss preparations for cable layout and installation
BBINST-G12-Q1-06
Perform cable layouts and installations
Quarter 2
Content standard
The learner demonstrates an understanding of the tools, technical specifications, and configuration procedures necessary to install and set up Customer Premises Equipment (CPE) effectively, ensuring optimal functionality and connectivity.
Performance standard
The learners perform CPE installation and configuration in accordance with technical specifications and industry standards.
Learning competencies (4)
BBINST-G12-Q2-01
Discuss the principles of Customer Premises Equipment (CPE)
BBINST-G12-Q2-02
Perform installations of Customer Premises Equipment (CPE) in accordance with industry standards
BBINST-G12-Q2-03
Perform configurations of Customer Premises Equipment (CPE) in accordance with industry standards
BBINST-G12-Q2-04
Perform testing and adjustment of Customer Premises Equipment (CPE) in accordance with the industry’s installer manual
Quarter 3
Content standard
The learners demonstrate an understanding of the fundamentals of fiber optic broadband network installation, maintenance, and quality assurance.
Performance standard
The learners perform installation and maintenance of fiber optic networks, achieving high signal quality, low loss, and reliable system operation, while adhering to the industry’s best practices and safety standards.
Learning competencies (4)
BBINST-G12-Q3-01
Discuss the fundamentals of fiber broadband
BBINST-G12-Q3-02
Discuss preparation for fiber optic cable layout and installation
BBINST-G12-Q3-03
Discuss preparation of fiber optic cable for splicing and joining
BBINST-G12-Q3-04
Perform splicing/joining fibers and installing protection sleeves using a fusion machine
Quarter 4
Content standard
The learners demonstrate an understanding of principles in splicing/joining fibers and installation of protection sleeves using the mechanical method as well as installation of aerial and underground cable support.
Performance standard
The learners perform splicing/joining fibers and installation of protection sleeves using mechanical method as well as installation of aerial and underground cable support while adhering to the industry’s best practices and safety standards
Learning competencies (5)
BBINST-G12-Q4-01
Perform splicing/joining fibers and installation of protection sleeves using the mechanical method
BBINST-G12-Q4-02
Perform installation of aerial cable closure and support
BBINST-G12-Q4-03
Perform installation of underground cable closure and support
BBINST-G12-Q4-04
Perform connection of fiber to the premises
BBINST-G12-Q4-05
Perform testing & activation
Planning a lesson from these?
Hubmatch lets you tick the competencies your lesson covers and writes a first draft around them — objectives, activities, assessment — which you then edit and export to Word. Two AI plans are free.
Draft a lesson plan